The Council would like to hear your views on potential alterations to the trim trail at Millfields. The trim trail runs around the perimeter of the park’s north-east corner and consists of equipment such as monkey bars, balancing beams and pull-up bars. It is designed to be used sequentially.
The trim trail at Millfields is in need of updating and replacement. There are two options that the Council would like to explore for this, with funding available to implement one of the options:
• Option 1 - retain the existing types of equipment and layout (the trim trail), replacing or repairing equipment where needed.
• Option 2 - remove the trim trail and create a dedicated exercise area within the park, comprised of fixed equipment such as parallel and pull-up bars. The proposed location for the dedicated area would be adjacent to the play area on Casimir Road (see map below).
Have your say
Hackney Council would like you to have your say on the options before an application for Common Land consent is submitted to the planning inspectorate.
The consultation ends on 9 December 2016.
No comments :
Post a Comment
Note: only a member of this blog may post a comment.